Current & Recent Projects

Impressed Current Cathodic Protection


Corrosion Modelling

  • DTI Project.
  • Modelling the durability of deck units for a tunnel to ensure they will achieve the required 120 year lifetime.

Corrosion Monitoring


Bridges

  • M4 Elevated Section – cathodic protection trials and corrosion monitoring
  • Bridge in Singapore
  • Cathodic protection of a new bridge with cast in chlorides
  • Evaluation of existing cathodic protection system overseas
  • Design and specification of trial and full scale systems

Buildings

  • Cathodic protection of historic building
  • Corrosion monitoring of historic building
  • Realkalisation and chloride extraction criteria; concrete repair overview for a landmark tower structure


Harbour Structures

  • Cathodic protection trials of impressed and galvanic cathodic protection
  • Design and specification of full scale systems in 7m tidal ranges


Car Parks

  • Corrosion Monitoring
  • Cathodic protection designs and specifications
  • Condition evaluations

Pipelines

  • Condition evaluations of prestressed concrete pipes
  • Cathodic protection criteria for prestressed concrete pipe

Industrial Plant

  • Cathodic protection of chimneys and retaining walls

Tunnel

  • Durability modelling and corrosion monitoring

Cathodic Protection Case Histories